PRODUCT CATALOGUE

Hydraulic Cylinders

Explore Duplomatic MS hydraulic cylinder series: HC2 tie-rod cylinders with 160 bar nominal pressure and 25-200 mm bores, and heavy-duty HC3 cylinders with 250 bar nominal pressure and 50-400 mm bores. Compare series specifications, mountings and options, then request an application-specific quotation from IMPEX CONNECT.

ENGINEERING TOOLS

Size it. Configure it.

Calculate cylinder performance, choose a catalogue size and prepare a cylinder enquiry in one place.

D / d × S
ISO 6020-2 · 160 barDouble-acting cylinder · single piston rod

01 / Hydraulic calculation

mm
mm
mm
bar
l/min
bar
%

100% = theoretical. A lower value is an assumed mechanical efficiency, not a measured guarantee.

02 / Catalogue configuration

mm

Positions 1–4 follow the catalogue front-view diagram. Confirm orientation on the drawing.

Open series catalogue ↗

Need double rod, sensors, ATEX or a custom design? Include the requirement in your enquiry.

HC2 / ISO 6020-2LIVE
SDd63 / 36 × 250 mm

Cylinder section — schematic, not a manufacturing drawing

Calculated performance

Extension ↗———
Retraction ↙———
ExtensionRetraction
Rod speed——
Full stroke time——
Chamber volume——
Effective area——
Displaced return flow——
Supply hydraulic power—

Same supply flow in each direction. Return flow can exceed pump flow during retraction.

Your catalogue code

Standard single-rod configuration without sensors or ATEX. Catalogue-based code, subject to technical and commercial confirmation.

    Request a quotation

    The quotation form opens with your code, inputs and results already filled in.

    Calculation basis

    Force F = (p₁A₁ − p₂A₂) × η. Speed v = Q/A. Stroke time t = S/v.

    Force in kN and metric tonnes-force (tf); dimensions in mm, pressure in bar, flow in l/min.

    Pressure is applied to the active chamber; back pressure acts on the opposite chamber. Force efficiency scales the resulting net hydraulic force. Flow calculations ignore leakage and compressibility.

    Preliminary sizing only. Rod buckling, mounting loads, cushioning energy, pressure peaks, pipe losses and duty cycle require engineering verification.